Maxim The Address to Singapore: Door-to-Door Commute via the RTS Link

Commuting from Maxim The Address to Singapore

Once the RTS Link opens in January 2027, a realistic door-to-door commute from Maxim The Address to the Singapore side is roughly 30–45 minutes — combining a short shuttle/drive to Bukit Chagar station (~3 km), the ~5-minute RTS crossing to Woodlands North, and onward MRT travel — versus the 1–2 hours peak-hour Causeway crawl it replaces. The RTS removes the single biggest friction in JB-Singapore living: the unpredictable border queue. Here’s the realistic breakdown.

Door-to-door, step by step (post-2027)

Leg Time (indicative)
Maxim → Bukit Chagar RTS station (~3 km, shuttle/drive) ~8–12 min
Immigration clearance (RTS, streamlined) ~5–10 min
RTS crossing → Woodlands North MRT ~5 min
Onward MRT in Singapore (e.g., to CBD) ~30–40 min
Total door-to-door ~50–65 min to CBD; ~20 min to Woodlands

Indicative; actual times depend on shuttle frequency, immigration volume and your Singapore destination.

Why this is a step-change

Today, the Causeway can take 1–2 hours at peak with no certainty. The RTS replaces queue risk with a fixed ~5-minute crossing and up to ~10,000 passengers per hour each way. For a Singapore-based professional, that turns "JB is too far" into "JB is a reasonable commute" — which is exactly what underpins the rental demand thesis and the rent-vs-buy math.

The 3 km, honestly

Maxim sits ~3 km from Bukit Chagar — not on the doorstep. A planned dedicated shuttle bridges this last leg. Closer projects exist (and charge for it), but the ~3 km trade buys a below-market entry and a mature township. See the exact route to Bukit Chagar.

Frequently asked questions

How long is the commute from Maxim The Address to Singapore?
Roughly 30–45 minutes door-to-door to Woodlands once the RTS opens (Jan 2027), or ~50–65 minutes to the Singapore CBD — versus 1–2 hours via the Causeway at peak today.

How far is Maxim The Address from the RTS station?
About 3 km from Bukit Chagar station, with a planned dedicated shuttle to bridge the last leg.

When does the RTS Link open?
It is on track to begin operations in January 2027, with a ~5-minute crossing to Woodlands North.


Reviewed by Jason Chan, Malaysia property consultant (DMS Team). Commute times indicative and subject to RTS operating details.

Next: JB vs renting in Singapore · Location & RTS · Investment analysis · Back to overview

Scroll to Top