Defect Liability Period: Your Rights After Handover

Quick answer

The defect liability period (DLP) is the window after handover during which the developer must fix defects at no cost to you. For new residential builds under the statutory SPA it is commonly 24 months from vacant possession. Inspect early, document everything, and submit written defect reports within the period to protect your rights.

What the DLP is

The defect liability period is a warranty window after you take vacant possession, during which the developer is obliged to repair defects in workmanship or materials free of charge. For new residential developments governed by the statutory SPA, the DLP has commonly been set at 24 months from the date of vacant possession – confirm the exact period in your own SPA.

What it typically covers

  • Workmanship defects – cracks, uneven finishes, faulty fittings.
  • Water issues – leaks, seepage, plumbing faults.
  • Electrical and mechanical – wiring, fixtures and installed equipment.
  • Doors, windows and tiling – misalignment, hollow tiles, poor sealing.

Normal wear and tear, or damage you cause after moving in, is not covered.

💡 Handover is one step in a longer journey – see how it fits with vacant possession and the CCC in our related Shah Alam buyer guides.

How to protect your rights

  1. Inspect thoroughly at handover – bring a checklist, tester and torch.
  2. Log every defect with photos, dates and locations.
  3. Submit a written defect report to the developer within the DLP.
  4. Allow reasonable access for rectification and keep records.
  5. If defects aren’t fixed, you may be entitled to recover repair costs per the SPA.
DoAvoid
Report in writing, in timeVerbal-only complaints
Photograph and date defectsDelaying past the DLP
Keep copies of all reportsMaking unauthorised repairs first

Why it matters for your purchase

A well-run DLP is a sign of a responsible developer and gives you two years of cover on a major purchase. When comparing projects like Aurora Residences in Seksyen 16, ask how the developer handles defect reports and rectification – responsiveness here says a lot about the after-sales experience you can expect.

Frequently asked questions

How long is the defect liability period in Malaysia?
For new residential developments under the statutory SPA it has commonly been 24 months from the date of vacant possession. Always confirm the exact period stated in your own SPA.
What does the DLP cover?
It covers defects in workmanship and materials – such as cracks, leaks, faulty fittings, electrical faults and poor tiling – repaired at the developer’s cost. It excludes normal wear and tear or damage you cause.
How do I make a defect claim?
Inspect early, document each defect with photos and dates, then submit a written defect report to the developer within the DLP and allow access for rectification.
What if the developer doesn’t fix the defects?
Under the SPA you may be entitled to have the work done and recover the cost from the developer or the retention sum. Keep all written records and seek legal advice if needed.

Buying a new Shah Alam condo?

Ask us about Aurora Residences – handover standards, layouts, price list and the latest promotion package.

Information is for general guidance as at 1 August 2026 and may change; confirm current details, distances and eligibility before you commit.

Sources: Housing Development (Control and Licensing) Act and SPA schedules; DMS Team – Shah Alam buyer guides; project sales materials.

Last updated 1 October 2026 · DMS Jason Chan, REN 78007

Leave a Comment

Your email address will not be published. Required fields are marked *

Follow DMS Team: Facebook · Instagram · TikTok · Xiaohongshu · YouTube · LinkedIn
Scroll to Top